Skip to main content
English
Specifier's guide

Specifying power management for emergency vehicles

A specifier's guide to the electrical decisions on a police, fire or ambulance build: what to put in the brief, what to ask a supplier and how to check the answers.

⁨Sam P.⁩, R&D Technician at Scorpion Automotive. Reviewed by ⁨James M.⁩, Technical Director at Scorpion Automotive.

What should an emergency vehicle power specification cover?

List every load with its current and priority, then decide how each is switched, protected and shed. Specify engine-off running, battery monitoring and fault reporting, and require the supplier to show how the configuration is saved and repeated across a fleet. The base vehicle's CAN network sets the limits.

Speak to us about vehicle power

Key facts

  • Intellitec MV supplies power management systems for police, fire and ambulance vehicles in the UK
  • It designs and assembles them in Bromborough, Wirral
  • The site is certified to ISO 9001 and ISO 14001, with Vehicle Certification Agency Conformity of Production accreditation
  • Controller, keypad and battery guard detail is on the police vehicle power page

The specification, line by line

Write the brief around the decisions below. Each row names what to define and what a good answer from a supplier looks like.

Emergency vehicle power management specification items and what to ask a supplier
ItemWhat to defineWhat a supplier should show
Load list Every circuit with its current, duty cycle and priorityHow each load is switched and which are fused or protected electronically
Switching method Relays and fuses, or a power distribution moduleWhere the logic lives and how it is changed without rewiring
Control and wiring Conventional loom, or multiplexed control over a networkLoom weight, fault-finding method and how a build is repeated
Load shedding Which loads drop first when voltage fallsPriority settings you can read and edit, and the voltage thresholds used
Battery protection How the starter battery is kept able to start the vehicleAuxiliary battery arrangement, split charging and isolation
Engine-off running Scene time with the engine idling or stoppedHow the vehicle is kept secure while it runs, and what cuts the engine if someone drives off
Vehicle integration Which signals are read from the base vehicleCAN connection to ignition, speed, park brake and doors, without cutting the factory loom
Fault reporting What a crew or workshop sees when a circuit tripsWhich output tripped, and a data log a workshop can read
Approvals and quality Quality certificates and any vehicle approval relevant to the buildCertificates in date, and the vehicle approval route for the finished conversion

Intellitec MV's own equipment is described on the police vehicle power management and emergency vehicle power management pages.

A tender checklist for the electrical sub-system

  1. Has the load list been signed off by the user?

  2. Can the supplier prove it can repeat a build?

  3. What happens to the starter battery at a long scene?

  4. How does the system talk to the base vehicle?

  5. How are faults shown and logged?

  6. Who assembles and certifies the equipment?

  7. What documentation arrives with the vehicle?

  8. Who supports it after handover?

Police, fire, ambulance and electric builds

  • Police cars: compact bodies, many loads and long standing time. The Intellitec iConnex Response controller handles 4 CAN buses, 1 LIN bus and 16 configurable inputs, and takes a supply from 9V to 32V.
  • Ambulances: medical equipment, radios and heating run for long periods, so battery management and engine-off power carry the most weight.
  • Fire and rescue: scene lighting and equipment loads often follow vehicle state, such as the park brake being set.
  • Electric response vehicles: there is no engine to idle, so the 12V draw must be controlled and the controller must read vehicle state over CAN.
130,000+ active customers
50+ years, since 1973
24/7 support
UK designed, built & fitted
FAQs

Frequently asked questions

What is power management on a blue-light vehicle?

It is the control of every added electrical load: switching, protecting, prioritising and shedding them so the equipment works and the vehicle still starts. A controller does it in place of banks of relays and fuses.

Do I need multiplexing, or will relays do?

A short equipment list can work with relays. A long list, repeat builds and fault finding all favour a configured controller, because changes become settings rather than rewiring.

How do I stop long scenes flattening the starter battery?

Specify an auxiliary battery, split charging and a load-shedding order, and ask for the voltage at which each load drops. Test it with the real equipment list switched on.

Which standards should the brief reference?

Start with your own ambulance trust or force specification and the national ambulance specification, then ask the supplier to list the standards its equipment and site are certified to. Check the current versions yourself.

Who supplies power management for UK emergency vehicles?

Intellitec MV, part of the Scorpion Group, supplies power management systems for police, fire and ambulance vehicles in the UK, designed and assembled in Bromborough, Wirral.

Preparing a specification or a tender?

Send us the base vehicle and the equipment list, and we will point you to the right Intellitec MV controller, keypads and battery protection.